CD Power Online
Home/Technology/Contract manufacturing

Technology

Contract manufacturing, explained

What contract manufacturing means in electronics, the common arrangements, and how to compare and qualify a contract builder.

Key points

  • Contract manufacturing means one organisation builds a product designed by another.
  • Build-to-print and turnkey differ in who designs and who buys the materials.
  • Design for manufacture and a clear test strategy reduce problems before production starts.
  • Intellectual property needs clear terms before design data is shared.

Contract manufacturing means that one organisation builds electronic products to the design and specification of another. It is widely used because a company can concentrate on design and the market while a specialist handles production equipment, staff and materials handling. This note explains the usual arrangements and how an engineer can compare them. It describes the practice only and does not offer any such service.

Common arrangements

Build-to-print means the customer supplies the complete design package, including drawings, a bill of materials and test requirements, and the builder assembles to it. In a turnkey arrangement the builder also purchases the materials and manages the supply chain. With consigned materials, the customer buys some or all of the parts and supplies them to the builder, who adds assembly and test. Each arrangement divides responsibility differently, in particular for part shortages, obsolescence and yield.

Design for manufacture and test

A design that is easy to build is cheaper and more reliable. Design for manufacture means checking pad sizes, spacing, panel layout, component orientation, and the suitability of parts for automatic placement and reflow. Test strategy means deciding in advance how each unit is checked: in-circuit test, functional test, burn-in or a combination, and which fixtures are needed. Agreeing these points before production begins avoids the expensive discovery of problems on the first batch. The steps are described in how power modules are made.

Intellectual property and qualification

Design files reveal how a product works, so agree who owns them, who may use them and what happens to tooling and test fixtures if the relationship ends. Written agreements should cover confidentiality and the ownership of any improvements.

When comparing builders, consider the type of products they build, their quality system, how they control materials and traceability, their test capability, how they handle engineering changes, and how well their communication works. Qualification usually starts with an audit or review, followed by a pilot build, and ends with an agreed first-article inspection. A look at quality standards gives more background on what to ask.

Continue reading