Working with distributors and suppliers

A generic guide for engineers on what distributors do, how to plan sampling and lead time, and what to ask about lifecycle and second sources.

Key points

  • Distributors hold stock, extend credit and provide logistics, which matters most for small and medium volumes.
  • Franchised and independent channels differ in traceability and in the support the maker provides.
  • Lead-time planning and second sourcing protect a schedule better than late expediting.
  • Ask about lifecycle and last-time-buy practice before a part is chosen, not after.

Most power modules and magnetic parts reach an engineer through a distributor rather than directly from the maker. This note describes in general terms what that channel does and what an engineer can sensibly ask of it. This site is a reference only and does not sell, quote or endorse any supplier.

What distributors do

A distributor buys parts in volume, holds them in stock and sells them in smaller quantities. It also handles shipping, customs, invoicing and often credit terms, and it may offer technical staff who can help with part selection. For a team building a few hundred units a year, this is usually far simpler than negotiating with each maker separately.

Franchised and independent channels

A franchised distributor buys under an agreement with the maker and normally passes on the maker's warranty and traceability information. An independent distributor, sometimes called a broker, buys from other sources, including surplus stock. Independent channels can find parts that are out of production, but the buyer takes more responsibility for checking authenticity and storage history. For safety-related or regulated products, traceability to the maker is often a requirement.

Planning supply

Lead time is the interval between placing an order and receiving the parts, and it varies with market conditions. Good practice is to place orders against a forecast, to hold a modest buffer of critical modules, and to order early samples so that evaluation does not sit on the critical path. Where the design allows, qualify a second source with a similar footprint, as discussed in the note on consolidation.

Lifecycle notices

Makers issue notices when they change a process, move production or retire a part. A last-time-buy notice gives customers a window to purchase remaining stock. Engineers should know who in the organisation receives these notices and what the response procedure is.

Questions worth asking

  • Is the part in active production, and is a replacement planned?
  • How is date code and lot traceability handled?
  • What is the usual notice period for a change or withdrawal?
  • Are samples available for evaluation, and are the electrical limits the same as for production parts?

The overview of converter families gives background on what is being bought.

Documentation to keep

Keep the datasheet revision, the date code of the samples evaluated and the order records for production parts. They help to answer questions that arise years later about what exactly was fitted to a given product.